point fraser

Jetty and Marine Construction was contracted to lay the supporting piles for Ku De Ta on the Swan River. This project saw 30 x 610mm piles and 30 x 323mm piles driven 24m below the seabed to ensure a stable foundation to construct the restaurant on.

Challenges arose from the shallow water in the area however JMC’s assets and expertise allowed for the project to be completed ahead of time with minimal disturbance to the public and environment.

Our skilled fabricators constructed a steel pile guide for our barge to allow piles to be driven with more precision and efficiency.