Duratec - Victoria Quay Sheet Piling
JMC was subcontracted to Duratec to strengthen the existing Victoria Quay wharf in three locations for the Fremantle Port Authority.
Using a 35-tonne excavator and Movax pile driver, we excavated the materials and drove sheet piling into the wharf to the required depth.
We managed the whole process and overcame various challenges with differing ground conditions, with minimal disruption to the environment and Victoria Quay patrons.